KRITIS-Dachgesetz: Obligations, Deadlines and Resilience Plan
For the first time, the KRITIS-Dachgesetz (KRITIS-DachG, the German critical infrastructure umbrella act) obliges operators of critical facilities across Germany to protect their facilities physically: registration with the BBK (Federal Office of Civil Protection and Disaster Assistance), a risk analysis at least every four years, resilience measures with a resilience plan, reporting of incidents within 24 hours and a duty of management to implement and monitor the measures. The act has been in force since 17 March 2026. However, the deadlines only start to run once an ordinance specifies which facilities are critical. At the time of writing, this ordinance was only available as a draft.
This article explains the obligations in detail and shows how you can prepare now. For an overview of IT security and physical resilience, see our page on KRITIS consulting.
What the KRITIS-Dachgesetz is about
Until now, German law mainly regulated the IT security of critical infrastructure, through the BSI Act (BSIG). Physical protection, i.e. against natural hazards, sabotage, terrorism, accidents or the failure of suppliers, was spread across many sector-specific laws or not regulated at all. The KRITIS-Dachgesetz transposes the EU Directive on the resilience of critical entities (CER Directive, (EU) 2022/2557) and creates a common framework for this.
The competent authority is the Bundesamt für Bevölkerungsschutz und Katastrophenhilfe (BBK, Federal Office of Civil Protection and Disaster Assistance). Registration and reports go through joint channels of the BSI and the BBK, so operators do not have to go through two separate procedures.
Who is covered
The act covers operators of critical facilities in ten sectors, from energy and water to health and food through to municipal waste disposal (Section 4). Which facilities are considered critical is determined by an ordinance of the Federal Ministry of the Interior on the basis of facility categories and thresholds (Section 5). The act gives 500,000 inhabitants supplied as the standard threshold. In addition, the ministry can designate facilities as critical in individual cases. The BBK informs the operator of this and requests it to register.
Exceptions apply in some areas: financial entities under DORA and operators in the information technology and telecommunications sector are exempt from most resilience obligations. In the sectors municipal waste disposal and social security and basic income support, only the obligation to carry out a risk analysis applies. For certain energy companies, special rules of the Energiewirtschaftsgesetz (EnWG, the German Energy Industry Act) apply to evidence and audits.
The roadmap: when which obligation applies
All deadlines build on registration, and registration builds on the ordinance:
| Point in time | What happens | Legal basis |
|---|---|---|
| Entry into force of the ordinance | Facilities are considered critical if they meet the criteria | Section 5 |
| No later than 4 weeks afterwards | BBK publishes the details of the registration procedure | Section 8 |
| No later than 3 months after being considered a critical facility | Registration via the joint registration facility of the BSI and the BBK | Section 8 |
| 9 months after registration | First risk analysis and risk assessment | Sections 8, 12 |
| 10 months after registration | Resilience measures and resilience plan, incident reporting, obligations of management | Sections 8, 13, 18, 20 |
| No later than 8 months after the ordinance | BBK provides templates and models for resilience plans | Section 13 (5) |
From the entry into force of the ordinance, there are therefore around 13 months until the first resilience plan is due. The originally fixed registration deadline of 17 July 2026 was abolished by an amendment to the act in July 2026 (BGBl. 2026 I No. 221).
- around 13 months from the entry into force of the ordinance until the first resilience plan
- every 4 years at least one risk analysis and risk assessment (Section 12)
- 24 hours after becoming aware, at the latest, the initial report of an incident to the BBK (Section 18)
Risk analysis under Section 12
Operators must analyse and assess the risks to their critical service as required, but at least every four years. The basis is the federal government's national risk analyses as well as other trustworthy sources. In particular, the analysis must take into account:
- the risks named in the national risk analyses: natural, technical and man-made risks, including accidents, natural hazards, public health emergencies and hybrid and terrorist threats (Section 11 (2) no. 1 KRITIS-DachG)
- dependencies on other operators, including from other sectors, neighbouring countries and third countries, for example on electricity, water or telecommunications providers
- dependencies of others on your own service
- for maritime infrastructure, its particular characteristics
The Federal Ministry of the Interior can lay down requirements on content and methodology, including templates, by ordinance. Anyone who already carries out a risk analysis under ISO 27001 or runs business continuity management should align the methods instead of setting up a second, independent analysis.
Resilience measures and resilience plan under Section 13
On the basis of the risk analysis, operators must take technical, security-related and organisational measures that take the state of the art into account and are proportionate. The act names four objectives and examples of measures:
| Objective | Examples from Section 13 (3) |
|---|---|
| Prevent incidents | Emergency preparedness |
| Protect facilities physically | Site protection such as fences or resistant façades, monitoring of the surroundings, detection equipment, access controls |
| Respond to incidents and limit their consequences | Risk and crisis management, defined alarm procedures |
| Restore the service quickly | Business continuity, for example emergency power supply, alternative supply chains |
| In addition: personnel | Security management for employees, including staff of external service providers |
| In addition: awareness | Information material, training and exercises |
The measures must be set out and applied in a resilience plan. The plan must show why each measure was chosen and refer to the risk analysis. It must be updated as required and after every new risk analysis. The BBK is to provide templates and models.
In practice, the resilience plan overlaps strongly with an emergency manual under BSI Standard 200-4 or a BCM system under ISO 22301 (see building BCM) and with the measures to maintain operations under Section 30 BSIG. A joint approach saves effort and prevents contradictory requirements.
Incident reporting under Section 18
Incidents must be reported to the BBK via the joint reporting office of the BBK and the BSI:
- Initial report: without undue delay, no later than 24 hours after becoming aware, with the information available, for example the number and proportion of those affected, the duration so far and expected, the area affected
- Update: for ongoing incidents
- Detailed report: no later than one month after becoming aware
Other reporting obligations remain unaffected. An incident that is also a significant IT security incident may therefore also have to be reported under Section 32 BSIG. A joint reporting process that covers both obligations makes sense. How the obligations under the BSIG and the KRITIS-Dachgesetz relate to each other overall is explained in the article KRITIS and NIS2: the difference.
Evidence, management and fines
Evidence (Section 16): The competent authority can request evidence via the BBK, demand audits, inspect the resilience plan and carry out on-site inspections at selected operators. The selection is risk-based; there is no fixed inspection cycle. For the parts that overlap with IT security, the authority can rely on evidence under Section 39 BSIG. If deficiencies are found, it can order an implementation plan and remedial action within a set deadline.
Management (Section 20): As under the BSIG, management must implement the resilience measures and monitor them through suitable organisational measures. In the event of a culpable breach of duty, management is liable under the rules of company law. Unlike Section 38 (3) BSIG, the KRITIS-Dachgesetz does not contain a separate training obligation. For operators that are also covered by the BSIG, however, this obligation applies anyway. More on this in the article NIS2 and management.
Fines (Section 24): tiered up to EUR 1 million, for example for disregarding enforceable orders; up to EUR 100,000 for incomplete or late registration details.
How to prepare now
Even though the deadlines are not yet running, time will be short once the ordinance comes into force. Five steps you can take today:
- Assess whether you are covered Are your facilities already above the thresholds of the BSI-KritisV (the BSI critical infrastructure ordinance) today, or close to the standard threshold of 500,000 inhabitants? Follow the draft KRITIS ordinance.
- Clarify responsibilities Who is responsible for physical security, who for IT security, who for emergency management, and how do they report to management?
- Take stock Collect existing risk assessments, emergency plans, site protection concepts and BCM documents.
- Record dependencies Which utilities and service providers do you need, and who depends on you?
- Prepare the reporting process One process for the BSIG and the KRITIS-Dachgesetz, with 24-hour availability.
How SDG supports you
We advise operators of critical facilities on IT security under the BSIG and on physical resilience under the KRITIS-Dachgesetz from a single source:
- Applicability assessment and support with registration
- Risk analysis and risk assessment under Section 12, aligned with the risk analysis of your ISMS
- Resilience measures and resilience plan under Section 13, linked with emergency and crisis management
- Reporting process for Section 18 KRITIS-DachG and Section 32 BSIG
- Preparation for evidence and audits, for example with a friendly audit
- ISMS based on ISO 27001 as a joint management system: ISO 27001 consulting
- External information security officer and management training: external information security officer, training
You can find all our services for KRITIS operators on the page KRITIS consulting.
Frequently asked questions about the KRITIS-Dachgesetz
Since when has the KRITIS-Dachgesetz applied?
Since 17 March 2026. However, the obligations for operators apply in stages from registration, and registration requires an ordinance that specifies which facilities are critical. At the time of writing, this ordinance was only available as a draft.
What is a resilience plan?
A document in which the operator sets out its resilience measures: to prevent incidents, for physical protection, for response and for recovery. The plan must show the reasons for the measures, refer to the risk analysis and be updated regularly.
How often must the risk analysis under the KRITIS-Dachgesetz be carried out?
As required, but at least every four years (Section 12 KRITIS-DachG). The first risk analysis is due nine months after registration.
What must be reported under the KRITIS-Dachgesetz?
Incidents must be reported to the BBK without undue delay, no later than 24 hours after becoming aware, via the joint reporting office of the BBK and the BSI. A detailed report follows no later than one month after becoming aware. Other reporting obligations, for example under the BSIG, remain in place.
Who is responsible for the KRITIS-Dachgesetz?
The Bundesamt für Bevölkerungsschutz und Katastrophenhilfe (BBK, Federal Office of Civil Protection and Disaster Assistance). Registration and reports go through joint channels with the BSI. Which facilities are critical is laid down by the Federal Ministry of the Interior by ordinance.
Does the KRITIS-Dachgesetz also apply to IT and telecommunications companies?
Operators of critical facilities in the information technology and telecommunications sector are exempt from most resilience obligations of the KRITIS-Dachgesetz. For them, mainly the requirements of the BSI Act apply.
Legal sources: KRITIS-Dachgesetz, BBK, Directive (EU) 2022/2557 (CER Directive), BSI Act
Note: This article provides general information and does not replace legal advice in individual cases. The legal framework is in transition.